The Redwoods Centre
BAM Construction

The Redwoods Centre

Who we worked with

  • Contractor:
    BAM Construction
  • Client:
    South Staffordshire & Shropshire NHS
  • Architect:
    Nightingale Associates

Job Breakdown

  • Approx. Value:
    £1.5M
  • Duration:
    52 Weeks
  • Location:
    Shrewsbury
  • Sector: Health Care

Job Breakdown

  • Approx. Value:
    £1.5M
  • Duration:
    52 Weeks
  • Location:
    Shrewsbury
  • Sector: Health Care

Who we worked with

BAM Construction

Construction of new mental health hospital spread across four individual buildings was designed to provide all levels of care to mental health patients in the Shropshire area.

The internal plastering and dry lining works were designed and specified to meet increased durability and performance across all areas. This was achieved by lining the partitions and walls with the Rigidur H High impact board with a Dura Finish plaster coat to partitions and solid masonry walls. Ceiling areas were lined by using various MF solutions to meet the fire requirements and Gyptone Lay in grid ceilings to provide acoustic absorption.

No items found.

Contact

Head Office
CG Reynolds Ltd
Units 9 & 10 Bickford Trading Est
Bickford Road
Aston
Birmingham
B6 7EE

Call (Head Office): 0121 328 9942

Call (London Office): 0207 123 4159

Fax: 0121 328 8374

Email: info@cgreynolds.co.uk

Be Social

Copyright © CG Reynolds Ltd. All Rights Reserved | Created by Gritt & Co